LAFARGE - CALCINOR 
Construction of a new lime plant

*

  • Year

    2012

  • Description

    Construction of a new industrial lime plant

  • Client

    CALCINOR

  • Location

    Ben hmed

CIMAR 
Construction and assembly of the new cement plant

*

  • Year

    2009

  • Description

    This Aït Baha plant is one of the most modern cement plants in the world, benefiting from the most advanced environmental protection technologies.

  • Client

    CIMAR

  • Location

    Ait Baha

HOLCIM 
extension of the cement plant

*

  • Year

    2007

  • Description

    Extension of the HOLCIM cement plant

  • Client

    HOLCIM

  • Location

    Ras el ma

PHOSBOUCRAA 
Phosphate receiving hopper and slag heap machine

*

  • Year

    2003

  • Description

    Design, supply and construction of a phosphate receiving hopper including a 350 tons/hour phosphate sterile transport and disposal machine. Spreading the product over a 180° field. Adjustable head boom, 22 meters long.

  • Client

    PHOSBOUCRAA (OCP GROUP)

  • Location

    Boucrâa

Maroc Phosphore 
storage of sulfuric acid

*

  • Year

    2001

  • Description

    Storage of sulfuric acid

  • Client

    Maroc Phosphore

  • Location

    Safi